• 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
  • 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
  • 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
  • 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
  • 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
  • 180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light

180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light

Application: Warehouse
Type: Efficient-Mirror Tri-proof Light
Feature: Anti-corrosion, Dust-Proof, Waterproof
Light Body Material: Aluminum Alloy
Product Name: LED Tri-Proof Light
LED Chip: SMD2835
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Shape
Rectangle
PF
>0.95
IP Grade
IP65
Color Temperature(CCT)
3000K/4000K/5000K/6000K
Input Voltage(V)
AC 220V( ± 10%)
Lamp Luminous Efficiency(Lm/W)
180lm/W
Warranty(Year)
5-Year
Color Rendering Index(Ra)
>80
Support Dimmer
Yes
Lighting Solutions Service
Lighting and Circuitry Design, Project Installatio
Lifespan (Hours)
50000
Certification
CE RoHS CB TUV SAA
Transport Package
Pearl Foam Inner Box and K=K Carton
Specification
20W 30W 40W 50W 60W 80W
Trademark
ATA
Origin
Made in China
HS Code
9405409000
Production Capacity
50000piece/Pieces /Month

Product Description


Product  Description:

6063 aluminum alloy shell+lens+PC diffuser (Clear Strip or Frosted) 

Anti-surge & lightning strikes up to 2.5KV, and withstand 4KV high voltage 

Luminous Efficiency:150-180LM/W

Color Temperature:3000K  4000K  5000K  6000K 

Power:50W  80W  100W  150W    

Beam Angle:30° 60° 90° 

Lifetime:50000hrs, Warranty: 5 years

It could be with sensor (turn on/off sensor, dim sensor), emergency kit.

suitabel for supermarket,  underground parking, warehouse, function well in waterproof and dustproof, suitable for outdoor and wet location lighting application

Techinical Parameters:
180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light

180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light

180lm/W Ik10 IP65 2FT/3FT/4FT/5FT 50W/80W/100W/150W LED Tri-Proof Light
Hook installation steps: 
1. Cut off power before operation.
2. Knowing the inside diameter of the luminaires then Choose suitable hook for the luminaires.
3. Fix the hook before installation and make the it can bear over 3 times weight of the lamp
4. Connect the lamp with hook and make it is safe.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND 
6. Light up the luminaires!

Bracket installation steps: 
1. Cut off power before installation.
2. Measure the hole size on the holder,choose suitable screw.
3. Fix the screw at the place where luminaires will be installed and it should can bear over 3 times the weight of the luminaires
4. Screw up the screws at both sides of holder, then connect the hold hole with screws, tighten it up.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND   
6. Light up the luminaires !  

Attention
Lamp must be vertical suspension and the supporter should can bear at least 3 times weight of the lamp.  

Application
1. factories, industrial production workshop, warehouse;
2. gym, stadiums, golf courses,
3. commercial establishments, overpasses, outdoor advertising board, landmarks;
4. stage, yard, garden, lawn, park, plaza;
5. supermarket, shopping mall, exhibition hall;
6. ships, airports, subways, gas station, the train station, highway toll station, dock 
7. factory, office, meeting room, conference hall, storeroom, etc. 

Packaging & Shipping
Packaging: carton for strong protection
Shipping   : 3-5 for samples, 5-15 for all items, DHL UPS EMS others are available.

User Manual:
Installation must be on more than 30kg load ceiling
Switch off power of the mains supply or respectively of the connection lead before doing any works.
Assembly must not damage or destroy conducting paths.
Make sure that the product is mounted on a stable, even and tilt-fixed background.
The complete installation must be done by an electrical expert who is familiar with the valid directives.

Quaity Control:  
Stability TEST: make sure 100% of the lamps be aging test at least 48hours  
Lighting TEST: make sure 100% of the lamps be lighted before packing
Drop TEST: make sure every single light have been well protected by box

Contact
Peony Jin
 
Please feel free to send us your inquiry, We are at your service any time!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now